Placerville Drive Bike/Ped Facilities and Bridge Replacement Project (CIP 41816 and 41410)

Welcome to the Placerville Drive Bicycle and Pedestrian Facilities Project (CIP 41816) and 

the Placerville Drive at Hangtown Creek Bridge Replacement Project (CIP 41410)!

The Placerville Drive Bicycle and Pedestrian Facilities project proposes to install new curb, gutter, sidewalk and bicycle lanes on both sides of Placerville Drive from Armory Drive to the US 50 undercrossing.  The project also includes new sidewalk and bicycle facilities on Green Valley Road from Mallard Lane to Placerville Drive.  The environmental document was adopted by the Placerville City Council on January 10, 2023.  Phase 1 of the project is fully funded for final design, right of way, and construction through the state Active Transportation Program.  Phase 1 includes the Green Valley Road segment, and Placerville Drive from Ray Lawyer Drive/Green Valley Road to Cold Springs Road.

The Placerville Drive Bridge Replacement project proposes to replace the two-lane bridge over Hangtown Creek, 0.3 miles west of Cold Springs Road, and replace it with a two lane bridge with a two-way left-turn lane, bicycle lanes, and sidewalks.  The environmental document was adopted by the Placerville City Council on November 9, 2022.  The project is fully funded for final design, right of way, and construction through the federal Highway Bridge Program.

Construction of both projects is planned to begin in the spring of 2026.

The Placerville Drive Bicycle and Pedestrian Facilities Project Final IS/MND is located here:  

 Final ISMND 

Mitigation Monitoring and Reporting Plan


 The Placerville Drive Bicycle and Pedestrian Facilities Project Draft IS/MND was circulated for public review and comment from November 9, 2022 to December 9, 2022.  The comment period is now closed.

 Draft ISMND - Bike Ped

Public Notice of Intent - Bike Ped


The Placerville Drive at Hangtown Creek Bridge Replacement Project Final IS/MND is located here:  

Final ISMND Placerville Drive Bridge 

Mitigation and Monitoring Plan


The Placerville Drive at Hangtown Creek Bridge Replacement Project Draft IS/MND was circulated for public review and comment from September 7, 2022 to October 10, 2022.  The comment period is now closed.

Draft ISMND - Bridge Project     

Public Notice of Intent


Second Public Meeting was held on March 29, 2022:   Open House Information

Project Exhibits discussed at the Public Meeting:  Project Schedule & Funding   Bridge Project Exhibits   Bike Ped Project Exhibits


First Public Meeting was held on May 8, 2019: 

5-08-19 Open House Information  Open House Exhibits  Bridge Project Information Sheet  Bike and Pedestrian Project Information